FTTH Fiberization Solutions
Four solutions, one network standard: connect without splicing with plug & play, go overhead with aerial fiber, build underground with air-blown fiber, and keep it all performing with maintenance.
Plug & Play
Pre-connectorised distribution from the cabinet to the home — HUB and SUB boxes cascade on factory-terminated cable, so the network is built without field splicing.
- Factory-made, consistent quality
- Plug and play — no field-splicing skill needed
- Faster construction and on-demand expansion

Hover any number to see the products and their datasheets.
Partner-sourced essentials (not SPARK-manufactured)· supplied within the project, not SPARK-manufactured
- OLT (Optical Line Terminal)
- Feeder fibre cable
- Cable trays & ladders
Aerial Fiber
Fibre suspended on existing utility poles and clamped along building facades — a route that avoids trenching where civil works are slow or not permitted.
- Poles inspected for structural soundness along the route
- Tension set and cable secured with lashing wire or clamps
- ADSS cable between HUBs, clamped on building facades

Hover any number to see the products and their datasheets.
Partner-sourced essentials (not SPARK-manufactured)· supplied within the project, not SPARK-manufactured
- ADSS / Figure-8 aerial cable
- Suspension & dead-end clamps
- Pole brackets & hardware
Air-Blown Fiber
Fibre is blown through micro-ducts with compressed air — a clean underground route from the exchange to every building, with spare tubes sealed and ready for future capacity.
- Every splice OTDR-tested
- Every link power-tested
- As-built drawings for every site

Hover any number to see the products and their datasheets.
Partner-sourced essentials (not SPARK-manufactured)· supplied within the project, not SPARK-manufactured
- Blowable micro fibre cable
- Fibre blowing machine & compressor
- Handholes & manholes
Maintenance
Maintenance built around service levels — preventive, corrective and emergency — run from a helpdesk and dispatching centre for fibre technicians.

From Alarm to Report
- 01DetectAutomated NMS alarms and customer service tickets.
- 02RespondWithin 1 hour for critical issues; every issue categorised.
- 03ResolveCritical issues within 4 hours; non-critical in scheduled maintenance.
- 04ReportLogs updated with every fix; SLA compliance reported monthly.
Preventive Maintenance
Scheduled monthly, quarterly and annual inspections and updates that prevent failures.
| Period | Activities | Duration |
|---|---|---|
| Monthly | Routine inspection | 1 day / month |
| Quarterly | Cleaning & firmware | 2 days / quarter |
| Annually | Full review | 5 days / year |
| As needed | Emergency repair | Variable |
Corrective Maintenance
Action on faults reported by customers or detected by monitoring tools. Immediate response to network outages or major signal loss.
| Metric | Target |
|---|---|
| Network uptime | 99.9% |
| Repair time (MTTR) | 4 h · critical |
| Response time | 1 hour |
| Resolution time | 24 h · non-critical |