Air-Blown Fiber
Fibre is blown through micro-ducts with compressed air — a clean underground route from the exchange to every building, with spare tubes sealed and ready for future capacity.
Explore the Solution — 6 Products

01Central office · 5 products
02SPK-SI-DUCTMicro-DuctMicro-ducts laid in a shallow trench carry the fibre that is blown in with compressed air.
03SPK-SI-DUCTMicro-Duct Push-Fit Connector & End CapPush-fit connectors join each duct length; end caps seal the spare tubes.
04SPK-FD-CLS-LJoint ClosureIn the handhole, the joint closure protects the splices where the route branches.
05SPK-FD-CAB-U22Outdoor Fiber Optic Distribution CabinetThe street cabinet cross-connects feeder to distribution for the area.
Hover any number to see the products and their datasheets.
Partner-sourced essentials (not SPARK-manufactured)· supplied within the project, not SPARK-manufactured
- Blowable micro fibre cable
- Fibre blowing machine & compressor
- Handholes & manholes
The Build Sequence — Ten Steps
- 01Planning & design approvalSurvey, network layout and BOQ, validated with the operator before work starts.
- 02Material delivery & warehousingBOQ checked, materials transported, inspected on arrival and tracked in a secure local store.
- 03Concrete basesCabinet bases marked, excavated, poured, levelled and cured — then verified and accepted.
- 04ExcavationPaths marked, soil classified and trenches dug to the specified dimensions, with a clean site and quality check.
- 05Cabinets & ODFCabinets anchored on their bases, ODFs installed, fibres arranged and labelled, initial checks run.
- 06Fibre boxesBoxes fixed on prepared surfaces, U-guard protection fitted, cables routed with no tight bends.
- 07Air blowingDucts cleared, cable blown from cabinet to box, checked for kinks and secured at both ends.
- 08SplicingFusion splicing at the ODF and box, every splice OTDR-checked, organised and labelled.
- 09TestingPower meter and OTDR on every link, compared with design values; losses fixed; test report issued.
- 10As-builtFinal installation recorded with exact positions and lengths in CAD / GIS, approved and archived.
Quality Gates
✓Every splice OTDR-tested
✓Every link power-tested
✓As-built drawings for every site